You expected to start using the new space or finish the job soon. Instead, the local inspector finds a problem as the project nears completion. Now you face extra work, added costs and a delay you did not plan for. In Massachusetts, that problem could delay a required certificate of occupancy, which allows the building to be used.
Who handles the correction?
A final inspection checks whether the finished work meets the building code, which sets rules for safe construction. An inspector might find a stair railing that sits below the required height. The official then identifies what needs fixing before the work passes.
That finding does not settle who agreed to handle the repair. Your contract describes what each side agreed to provide. Plans may also show whether the railing meets the agreed design. Even if the property owner requested a change, the finished work still has to meet code.
Who pays for the repairs?
Repair bills grow when correcting one part requires workers to remove nearby finished work. Your contract often helps show which party agreed to cover the cost of repairs. Estimates help you discuss the expected price, while paid invoices show what the repairs actually cost.
You and the other party might disagree over whether to repair the railing or replace the whole stairway. The inspector’s findings identify the code issue, and repair quotes show the price of each option. That difference matters if one proposal includes an upgrade beyond the required fix.
Finishing the project
An unresolved repair bill makes it harder to close out the project. You may want to keep the inspector’s report and record how each party views the cost before repairs begin. If the issue turns into a building contract dispute, those notes help explain which charges each side accepts or challenges.